Condensate Acidic Neutralizing Tubes

Specifications

Suggested Specification

Condensate Neutralizer

The contractor shall supply and install fireside condensate neutralizing tubes for each boiler condensate drain and all flue pipe condensate drains. The condensate tubes shall be designed to raise the PH level 10-30 times more towards the neutral point of the PH being discharged by the boiler or furnace. The neutralizer tube or tubes shall be Model (    ), as manufactured by JJM Boiler Works.

The installing contractor shall supply all boilers and flue condensate drains with "P-traps" and unions before the neutralizing tubes. All piping shall be PVC and supplied/installed by the contractor. Plastic tubing is an acceptable alternative when used with barbed fittings. All PVC joints shall be glued in place and all barbed fittings shall be secured with tie wraps.

The boiler and flue condensate drains shall not be combined into one neutralizer. All piping shall be per manufactures piping diagrams and directions. All neutralizing tubes shall be secured to the floor or wall so as not to be exposed to damage or within a normal walkway. The contractor shall fill all "P-traps" and neutralizing tubes with tap water before the firing of any boiler

The contractor shall inform the owner of any maintenance or scheduled recharge of the tube's limestone aggregate as described in the manufacture's I and O manual.

 

Site Design, Hosting, and Search Engine Optimization by Positronic Design